Call1800 335 828 Start a project

A subcontractor that represents you well.Your reputation. Our priority.

Sunshine Coast HVAC with an in-house mechanical engineer. We come in before the frame goes up and stay through to handover.

EngineeringIn-house
ElectricalIn-house licence
InstallationOur own crew
BasedBaringa QLD
Capability Statement for Building Partnerships
Equipment we specify and install
HisenseFujitsuAirTouchPolyaireHisenseFujitsuAirTouchPolyaire HisenseFujitsuAirTouchPolyaireHisenseFujitsuAirTouchPolyaire
Overview

An engineering partner, not another subcontractor.

Most HVAC problems on a build are decisions made too late. Equipment sized after the roof is on. Return air worked out once the frame is already up.

We engage before the frame goes up, so sizing and roof space are built into the structure instead of worked around it.

Delta Temp crew running ducting through an open ceiling at rough-in
The Delta Temp crew and fleet at the Baringa workshop
On your site

Our own crew, start to finish.

We do not use subcontractors. Our mechanical engineer designs the system and our own licensed crew installs and commissions it, the same crew from rough-in through to handover. Your site supervisor deals with one contact the whole way.

From a builder we work with

“Communication’s amazing … Yeah, I can’t fault it.”

DanaProject Administrator, Gold Leaf Constructions
Dana from Gold Leaf Constructions
Our Process

Five steps, mapped to your schedule.

1

Pre-Frame Engagement

Before slab pour

We review the plans and run the heat load on the architectural drawings, so sizing and roof space are confirmed before any structural decision is locked in.

Plans reviewHeat load calculationsEquipment sizingRoof space requirementsReturn air locations before frame stage
2

Engineering and Design

In-house, not outsourced

Our mechanical engineer runs the heat load, selects the equipment and designs the zone and outlet layout, for our own supply and installation. No third-party delay.

Heat load calculationsEquipment specificationZone designOutlet and controller locationsReturn air sizing
3

Documentation and Safety

Before work starts

SWMS prepared before any high-risk work, signed on site by the crew doing it, with the signed PDF straight onto the job file.

SWMS for all HRCWOn-site crew sign-onSigned PDFs to job fileSite safety file documentation
4

Installation

Rough-in to commissioning

Rough-in, second fix and commissioning scheduled around your programme, with early notice of anything that moves.

Rough-inSecond fixCommissioningBuild programme coordination
5

Handover

Homeowner ready

Homeowner induction, commissioning records, warranties and the compliance certificate for your handover pack.

Homeowner inductionCommissioning recordsWarranty documentationCompliance certificate
Delta Temp technician setting out on a timber-framed new build
Delta Temp technicians working through the frame
Delta Temp crew installing ducting into the ceiling space
On site

What it looks like on your job.

Delta Temp on site at frame stage
Delta Temp crew installing ducting on a new build
What We Bring to Your Build

Four things that change how the job runs.

In-House Mechanical Engineering

Heat load, equipment selection and zone design done internally. No outsourcing, and no gaps in who is responsible.

Early Engagement

Sizing and roof space locked before the slab. No trades crossing over later, and no structural requests landing on your desk.

Complete Safety Documentation

SWMS for every high-risk activity, signed before work begins and filed the same day, without you chasing us for it.

Build Programme Coordination

One contact for your site supervisor, from first plans review through to handover.

The Delta Temp fleet at the Baringa workshop
Services

What we cover.

Design consultation

  • Heat load calculations
  • Equipment specification
  • Zone and outlet design

Installation

  • Ducted air conditioning
  • Multi-zone systems
  • Split system air conditioning
  • Multi-head splits
  • Ventilation and fresh air

Commercial and ongoing

  • Commercial HVAC
  • Commissioning and testing
  • Preventative maintenance
A Delta Temp technician arriving on site
Next Step

Bring us in before the frame goes up.

Send through the plans for your next project. We will design all of the relevant systems, come back with sizing and roof space requirements, and give you a price you can build into your programme.